Share
twitterlinkedinfacebook
Image 1 of 1
KDD00814UK.jpg
Over 4,000 tonnes of scaffolding was used to enable safe access to the bridge. All of it was assembled and disassembled by hand, on the 125 year old Forth Rail Bridge which spans the river Forth near Edinburgh. Network Rail, the operator of the rail track that leads over the bridge, has spent 10 years and GBP 130 million repainting the 230,000 square metres of steel and 6.5 million rivets on the bridge. The iconic red paint used on the bridge is made to match the red-oxide paint used over 100 years ago. The bridge will now need no further painting for at least 20 years.